NEW REFRIGERATION PLANTROOM AT AFFCO WAIROA

KEY PROJECT INFORMATION

Excel Engineering designed and built a turnkey ammonia refrigeration system, incorporating heat pumps and covering all aspects of process, mechanical, and electrical work. This comprehensive project included refrigeration, piping & mechanical, and electrical & instrumentation control (E&IC).

The project was executed in three key stages:

  1. Design & Build: Construction of a new plantroom, including crane lifting the vessels and compressors into position on site.
  2. Integration & Decommissioning: Connection to existing cold storage facilities and decommissioning of the old plantroom.
  3. Heat Pump Integration: Full-site integration with new supply temperatures and buffer tanks at 45°C, 65°C, and 85°C.

Key Features & Benefits:

  • Efficient Heat Recovery: Capturing over 1000 kW of energy to produce warm water at 40°C.
  • Medium Temperature Heat Pump: Delivering 1.1 MW of hot water at 65°C.
  • High Temperature Heat Pump: Supplying 1.3 MW of hot water at 88°C.

This system significantly improves energy efficiency, sustainability, and operational performance across the facility.

VIEW MORE PROJECTS

Contact Your Local Excel RAC Tech HVAC Tech Engineer Today!